国产免费一期二期三期区别,国产AV妓女影视妓女影院,爽爽影院现观看免费,亚洲精品NV久久久久久久久久

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

日韩在线一区二区三区免费视频| 韩国无码一区二区三区免费视频 | 色猫咪av在线网址| 人妻无码视频一区二区三区| 久久久久亚洲av无码专区喷水| 国产无遮挡裸体免费视频在线观看 | 伊人久久大香线蕉综合影院首页| 亚洲色成人网站www永久| 国产真实乱对白精彩| 午夜影院0606免费| 男女xx00上下抽搐动态图| 亚洲人成人无码网www国产 | 精品国内片67194| 国产av旡码专区亚洲av苍井空| 国语自产精品视频在线看| 色一情一区二区三区四区 | 色久悠悠婷婷综合在线亚洲| 日本道精品一区二区三区| 久久99精品久久久久久秒播| 台湾佬中文娱乐网22| 无码中文字幕色专区| 色婷婷六月亚洲婷婷丁香| 精品国产亚洲av麻豆| 精品久久久久久无码中文字幕一区| 欧美疯狂做受xxxxx高潮| 99热精国产这里只有精品| 亚洲乱亚洲乱妇无码麻豆| 浮妇高潮喷白浆视频| 热99re久久精品这里都是精品免费| 精品国产粉嫩内射白浆内射双马尾 | aa级女人大片免费视频| 精品日本一区二区三区在线观看| 台湾佬中文娱乐网22| 人妻少妇精品视频专区| 在线播放无码高潮的视频| 亚洲av无码乱码国产精品| 人妻丰满熟妇av无码片| 亚洲av无码一区东京热久久| 国模大尺度啪啪| 中文字幕久久久久人妻| 亚洲女同一区二区|